Desc : A bridge was constructed to restore a subsided section due to a tectonic fault
Harakas Bridge
A custom post type for locations
Desc : A bridge was constructed to restore a subsided section due to a tectonic fault
Desc : K.Liaromatis constructed one of the largest arched bridges in the world- Tsakona Bridge.
Desc : Our top-running cranes with 10 tons capacity are used in their facility for safe load handling.
Desc : Our top-running crane with 10 tn capacity is used in their facility for safe load handling.
Desc : Our top-running cranes with 10 x 32/10 tons capacity are used in their facility for safe load handling.
Desc : Our top-running cranes with 25/20 tn capacity are used in their facility for safe load handling.
Desc : Our top-running crane with 16 tn capacity is used in their facility for safe load handling.
Desc : Our top-running cranes, 100/32 tn and 45 tn, are used in their facility for safe load handling.
Desc : Our top-running crane with 5 tn is used in their facility for safe load handling.
Desc : We have two big cranes, each with a 20-5 tn capacity, to easily lift loads and transport them.